Roadworks & Bridges

Roadworks & Bridges

Civil & Infrastructure

30+

Projects built

$50M+

Combined value

Total figures since 1990

Hutchies’ culture is built upon connections. This is what drives us to improve and create the exceptional structures that bring people together. From iconic boardwalks to bridges, we put in an extra level of care to choose quality materials and operational services that promise the longevity of our structures. We’re passionate about the protecting Australia’s greatest asset - the environment and take additional measures to ensure each project has a comprehensive tailored environmental plan.

Glenlyon Pedestrian Bridge

GlenlyonPedestrianBridge

Roadworks&Bridges

$400K

Project value

18

Weeks to build

34m

Length span

22

Tonnes

Gabul Way

GabulWay

Roadworks&Bridges

$5M

Project value

38

Weeks to build

300m

Long

Park Road Boardwalk

ParkRoadBoardwalk

Roadworks&Bridges

$7M

Project value

34

Weeks to build

420M

Boardwalk

Barracks at Metroplex

BarracksatMetroplex

Roadworks&Bridges

$34.5M

Project value

69

Weeks to build

330,000M³

Level 1 fill

130,000M²

Pad trim

The Avenues

TheAvenues

Civil&Infrastructure

$25M

Project value

10+

Stages

Chinderah Highway Upgrade

ChinderahHighwayUpgrade

Civil&Infrastructure

$18M

Project value

87

Weeks to build

70,000m³

Cubic meters internal works