Newstead Central

Sector

Residential

Location

Newstead, QLD

Newstead Central

Stats

$189.5M

Total project value

245

Total weeks to build

634

Apartments

3

Towers

Details

Client

Metro Property Group

Subsector

High Rise

Completed

2018

Share

Contributors

Client

Architect

Landscape Architect

Civil & Structural Engineer

Electrical Engineer

Mechanical Engineer

Hydraulic Engineer

Lift Consultant

Building Certifier

Town Planner

Quantity Surveyor

Quantity Surveyor

Team Leader

Eddie Gangemi

Team Leader

Eddie Gangemi

Architect

Cox Architecture

Landscape Architect

RPS Group

Civil & Structural Engineer

Fidelis

Electrical Engineer

Nielsens Electrical

Mechanical Engineer

Global Air

Hydraulic Engineer

Christopher Contracting

Lift Consultant

Kone

Building Certifier

McKenzie Group

Town Planner

RPS Group

Quantity Surveyor

Napier & Blakeley

Newstead Central is a multi-stage residential development in the heart of the vibrant inner Brisbane precinct of Newstead; which has been experiencing major urban renewal. Concurrent construction of stages two (St Tropez) and three (Laguna) was completed in 2017, with both achieving practical completion early. Stage four (Capri) successfully reached completion in April 2018.

Eddie Gangemi's team was awarded this design and construct contract as the result of a competitive tender against six other builders. The differentiating features of our proposal were: a holistic approach incorporating an innovative construction methodology, and an ability to reduce time and add value by improving the net saleable area (NSA) which ultimately increased the Client's overall revenue on this project. Our novel proposal to commence construction while simultaneously performing 'mining' works to dig out the basement levels was the cornerstone of our approach. By re-designing the foundations of the basements and creating additional residential units without altering the gross building area (GBA), we were able to save millions of dollars for the Client and reduce the overall programme by almost ten months.

The geotechnical conditions of the site were particularly challenging, with a large component of marine mud, incorporating an element of acid sulphate and other contaminates. As a result of these poor conditions, the soil had no bearing capacity, requiring the installation of foundation piles from street level and the use of long reach excavators. Hutchies implemented a cased secant wall solution which is a series of piles that interlock and minimise water penetration.

The project team worked closely with the local community to minimise disruption due to noise and impact on foot and vehicular traffic; whilst supporting and promoting nearby eateries and other small businesses. Funds were raised for charities through on site initiatives.

#Awards

Newstead Central (Stages 2&3)

2018 AIB Professional Excellence in Building Awards National Building Professional of the Year - Eddie Gangemi

2018 AIB Professional Excellence in Building Awards National Residential Construction $100M Plus

2018 AIB Professional Excellence in Building Awards Queensland Building Professional of the Year - Eddie Gangemi

2018 AIB Professional Excellence in Building Awards Queensland Residential Construction $100M Plus

St Tropez

St Tropez

Stage Two

$121M

Project value*

69

Weeks to build

231

Apartments

*Combined Stage 2 & 3 project value
Laguna

Laguna

Stage Three

$121M

Project value*

88

Weeks to build

193

Apartments

*Combined Stage 2 & 3 project value

#St. Tropez & Laguna Construction Timelapse

Capri

Capri

Stage Four

$68.5M

Project value

119

Weeks to build

210

Apartments

#Renders

St Tropez
StTropez
Laguna
Laguna
Capri