Design & Construct

As experienced Design and Construct builders, Hutchies recognises the vital role design plays in our projects. We work closely with some of Australia’s best design consultants to ensure the delivery of extraordinary craftsmanship that maximises value and outcome.

Miles Aerodrome

MilesAerodrome

Transport

$4M

Project value

19

Weeks to build

Glenlyon Pedestrian Bridge

GlenlyonPedestrianBridge

Roadworks&Bridges

$400K

Project value

18

Weeks to build

34m

Length span

22

Tonnes

Moranbah Airport

MoranbahAirport

Transport

$16M

Project value

30

Weeks to build

2970m²

Built area

420 on Flinders (Ergon Energy)

$43M

Project value

69

Weeks to build

5 Star

Green Star

7000m²

Built area

900 Ann (Aurizon)

$130M

Project value

104

Weeks to build

5 Star

Green Star

19,980m²

NLA

BDO Workplace

BDOWorkplace

Office

$7M

Project value

73

Weeks to build

6000m²

Built area

Gasometer

$79M

Project value

89

Weeks to build

5 Star

Green Star

24,521m²

Built area

Goods Shed South (Pearson Group Australia)

$46M

Project value

79

Weeks to build

5 Star

Green Star

7125m²

Integrated fitout

Maroochydore Government Service Centre

$53M

Project value

68

Weeks to build

6 Star

Green Star

PA Hospital Car Park

$25M

Project value

52

Weeks to build

1400

Parking spaces

Global Switch Data Centre

$150M

Project value

88

Weeks to build

18,894m²

Floor space

1850W/m²

Power density

Santos Place

SantosPlace

Office

$146M

Project value

104

Weeks to build

6 Star

Green Star

150m

Tall

6 James Street

$1.5M

Project value

19

Weeks to build

140m²

Built area

$48.5M

Project value

64

Weeks to build

17,000m²

Built area

Cajuput FIFO Accommodation

$35M

Project value

42

Weeks to build

155

Self-contained suites

Australia Pacific LNG

$220M+

Combined value

27

Projects built

10+

Locations in QLD

BMA Mine Villages

BMAMineVillages

Villages

$130M+

Combined value

24+

Projects built

3+

Locations in QLD

Broadmeadows Mine

BroadmeadowsMine

Civil&Infrastructure

$90M+

Combined value

2

Projects built

2nd World War Memorial Aquatic Centre

2ndWorldWarMemorialAquaticCentre

Sporting,Parks&Recreation

$3.5M

Project value

44

Weeks to build

50m

Olympic swimming pool

UOW Student Villages

UOWStudentVillages

StudentAccommodation

$120M

Project value

PPP

Public-Private Partnership delivery model

1054

Beds

135

Weeks to build

Sullivan Nicolaides Pathology

SullivanNicolaidesPathology

Research,Development&Science

$95M

Project value

90

Weeks to build

PC3

Laboratories

The Milton

TheMilton

HighRise

$95M

Project Value

301

Apartments

97

Weeks to build

215 Adelaide Street

$20M

Project value

45

Weeks to build

3

Awards

Blue Tower End of Trip Facilities

$1M

Project value

20

Weeks to build

AEIOU Centres

AEIOUCentres

EarlyEducation

$22M

Combined value

12

Projects built

2024

Latest project

UTS Yura Mudang Student Accommodation

UTSYuraMudangStudentAccommodation

StudentAccommodation

$75M

Project value

106

Weeks to build

720

Beds

3 mo

Early delivery

La Trobe University Student Residences

$16M

Project value

200

Beds

69

Weeks to build

Aspley State High School Science Block

$1M

Project value

20

Weeks to build

3

Science labs

Kelvin Grove State College

$11M

Project value

52

Weeks to build

Year 7

Flying start to high school

Somerville House

SomervilleHouse

Secondary

$25M

Combine value

3

Projects built

20+

Years of relationship

The Valley Emporium

$22M

Project value

85

Weeks to build

7

Levels

Circa Nundah Village (Energex)

$100M+

Combined value

4

Projects built

186

No. of apartments

Arc by Crown Group

ArcbyCrownGroup

HighRise

$118M

Project value

163

Weeks to build

148

Apartments

73

Five star hotel suites

Arena Apartments

$52.5M

Project value

74

Weeks to build

191

Apartments

2

Towers

Cornerstone Living

$66.8M

Combined project value

11

Stages built

268

Homes built so far

20

Total stages

Hayman Island Private Residence

$8M

Project value

18

Weeks to build

1100m²

Built area

The Barracks Precinct (Hatch)

$71M

Project value

98

Weeks to build

5 Star

NABERS Rating

5

Levels

SW1 (Jacobs, Colorado & Downer EDI)

$207M

Combined value

6

No. of projects

5 Star

Green Star

ThePacific

MixedUse

$112M

Project value

93

Weeks to build

6

Levels

IKON

IKON

MidRise

$35M

Project value

79

Weeks to build

116

Apartments

IVY & EVE

IVY&EVE

HighRise

$135.8M

Project value

122

Weeks to build

2

Towers

476

Apartments

Marina Quays

MarinaQuays

LowRise

$28M

Project value

63

Weeks to build

104

Apartments

One Box Hill

OneBoxHill

MidRise

$20M

Project value

52

Weeks to build

90

Apartments

Brisbane Skytower

$376M

Project value

174

Weeks to build

90

Storeys

378K

M² ceilings and partitions

The Carlson

TheCarlson

HighRise

$31M

Project value

87

Weeks to build

149

Apartments

34

Storeys

The Residence

TheResidence

HighRise

$96M

Project value

132

Weeks to build

87

Apartments

24

Storeys

The Highgate

TheHighgate

MidRise

$30.7M

Project value

90

Weeks to build

31

Apartments

Coles Supermarkets (170+ Stores)

$300M+

Combined value

170+

Projects built

1997

Year of first project

30%

Refurbishments

Pizzey Skatepark

PizzeySkatepark

Sporting,Parks&Recreation

$1M

Project value

24

Weeks to build

Quad Park Stadium

QuadParkStadium

Sporting,Parks&Recreation

$7M

Project value

51

Weeks to build

1050

Capacity

Brisbane Broncos Clive Berghofer Centre

BrisbaneBroncosCliveBerghoferCentre

Sporting,Parks&Recreation

$21.9M

Project value

58

Weeks to build

6300m²

Built area

9750m²

Field area

Target (30+ Stores)

$20M+

Combined value

2014

Year of first project

30+

Projects built

90%

Refurbishments

Mondelez Innovation Hub

$2.5M

Project value

19

Weeks to complete

400m²

Total built area

James Street Precinct

$20M+

Combined value

1998

Year of first project

3

Awards

North Lakes Health Precinct

$32M

Project value

77

Weeks to build

60

Beds

Alfred Health

AlfredHealth

Hospital

$12M

Combined value

2

Projects built

Cairns Hospital

CairnsHospital

Hospital

$25M

Combined value

7

Projects

2009

Year of first project

CSIRO

CSIRO

Research,Development&Science

$24M

Combined value

7

Projects built

1994

First project built

Gympie Radiology

$3M

Project value

31

Weeks to build

1

Award

Central Townsville

CentralTownsville

NeighbourhoodCentre

$37M

Project value

70

Weeks to build

DFO Connector 4 & Multi-Deck Carpark

DFOConnector4&Multi-DeckCarpark

NeighbourhoodCentre

$29M

Project value

45

Weeks to build

7000M²

Built area

Gateway Shopping Centre

GatewayShoppingCentre

NeighbourhoodCentre

$145M

Project value

93

Weeks to build

30,000M²

Built area

Vincentia Marketplace

VincentiaMarketplace

NeighbourhoodCentre

$23.5M

Project value

45

Weeks to build

48,000M²

Built area

Queensland Community Care Units

$7M

Avg project value

6

Projects built

40

Avg weeks to build

20

Avg beds per project

Casuarina Village

CasuarinaVillage

NeighbourhoodCentre

$11M

Project value

44

Weeks to build

The Ville

TheVille

Entertainment&Leisure

$28M

Project value

110

Weeks to build

3

New restaurants

Spire

Spire

HighRise

$91M

Project value

125

Weeks to build

40

Levels

340

Apartments

Gabul Way

GabulWay

Roadworks&Bridges

$5M

Project value

38

Weeks to build

300m

Long

Masters Home Improvement (4 Stores)

$75M

Combined value

4

Stores built

45

Avg weeks to build

Verde Office Tower

$60M

Combined value

84

Weeks to build

$16M

Fit out component

5 Star

Green Star

Infiniti Showroom

$1.6M

Project value

19

Weeks to build

Cova Gallery Terraces

$13M

Project value

29

Weeks to build

60

Homes

Richmont Hotel

$15M

Project value

73

Weeks to build

110

Suites

Gympie Aquatic Recreation Centre

GympieAquaticRecreationCentre

Sporting,Parks&Recreation

$18M

Project value

62

Weeks to build

2

Pools

Craggy Range Winery

CraggyRangeWinery

TouristAttraction

$34M

Project value

2003

Year completed

Club Pine Rivers

$13.9M

Combined value

11

Extensions & refurbishments

1999

Year of first project

Alpen Ridge

AlpenRidge

Hotel

$17M

Project value

70

Weeks to build

31

Suites

Thrifty Car Rental Facility

ThriftyCarRentalFacility

ProcessingPlant

$1.9M

Project value

19

Weeks to build

8000m²

Built area

Metro Residences

MetroResidences

HighRise

$227M

Project value

128

Weeks to build

3

Towers

552

Apartments

BHP Housing

BHPHousing

Housing

$54M

Combined value

5

Projects built

88

Houses

Capri on Via Roma

CaprionViaRoma

NeighbourhoodCentre

$30M

Project value

2

Stages

83

Weeks to build

G35 by Tessa

G35byTessa

MidRise

$6M

Project value

43

Weeks to build

28

Apartments

Parkwood International Gold Coast Titans Training Centre

$12.4M

Project value

53

Weeks to build

Beach Life Homes

$7M

Project value

50

Weeks to build

CQU Mackay Accommodation

CQUMackayAccommodation

StudentAccommodation

$7M

Project value

28

Weeks to build

3

Awards won

Boggo Road Village

$39M

Total project value

146

Total weeks to build

2

Stages

Mamu Tropical Skywalk

MamuTropicalSkywalk

TouristAttraction

$9M

Project value

59

Weeks to build

RACQ Capricorn Helicopter Rescue Service Hangar

$5M

Project value

40

Weeks to build

Linc + Affinity at Yungaba

$25M

Combined value

58

Weeks to build

89

Apartments

The Residences at Yungaba

$12.4M

Project value

61

Weeks to build

10

Luxury residences

Wests Bulldogs Rugby Union Clubhouse

WestsBulldogsRugbyUnionClubhouse

Sporting,Parks&Recreation

$8.3M

Project value

44

Weeks to build

160,000

Individual bricks

14,000m³

Soil moved

Maranatha Aged Care

$5M

Project value

49

Weeks to build

Opera Apartments

OperaApartments

HighRise

$52M

Project value

100

Weeks to build

180

Apartments

Walan Apartments

$30M

Project value

89

Weeks to build

14

Apartments

14

Floors

SODA

SODA

HighRise

$37M

Project value

90

Weeks to build

20

Storeys

131

Apartments

Mareeba Gardens by Blue Care

$6.5M

Project value

68

Weeks to build

74

Beds

Coral Sea Gardens by Holy Spirit

$29M

Project value

95

Weeks to build

38

Beds

3

Stages

The Clayfield by Aveo

TheClayfieldbyAveo

Retirement

$27M

Project value

61

Weeks to build

66

Apartments

Aveo Springfield

AveoSpringfield

Retirement

$26M

Project value

48

Weeks to build

66

Apartments

Freedom Fuels

FreedomFuels

ServiceStation

$2M

Project value

15

Weeks to build

2

90,000L fuel tanks

The Original Waltzing Matilda Centre

$2.5M

Project value

50

Weeks to build

ANU Student Accommodation

ANUStudentAccommodation

StudentAccommodation

$19M

Project value

50

Weeks to build

198

Beds

Neighbourhood Carpark

$2.2M

Project value

27

Weeks to build

Wilsonton Link

WilsontonLink

NeighbourhoodCentre

$3.5M

Project value

25

Weeks to build

12

Tenancies

The Calile

TheCalile

Hotel

$63M

Project value

78

Weeks to build

178

Luxury rooms

270,000

White bricks

Jade Apartments

$98M

Project value

160

Weeks to build

4

Stages

369

Apartments

Sage Hotel James Street

$15.5M

Project value

53

Weeks to build

93

Rooms

Breeze by Aria

BreezebyAria

MidRise

$19.7M

Project value

61

Weeks to build

58

Luxury apartments

10

Levels

Parkside on Folkestone

$9M

Project value

92

Weeks to build

Jaguar Land Rover Showroom

$3.5M

Project value

37

Weeks to build

Bravehearts

Bravehearts

Centres&Libraries

$1.3M

Project value

18

Weeks to build

St Vincent's Hospital

$50M+

Combined value

20+

Projects built

6

New operating theatres

16

Bed recovery area

Brisbane Powerhouse

BrisbanePowerhouse

Entertainment&Leisure

$3.5M

Project value

5

Stages

Twin Towns

TwinTowns

Club

$21M

Combined project value

51

Weeks to build

2

Stages

Cairns State Special School

$31M

Project value

52

Weeks to build

Queensland Rail Stations

$110M+

Combined value

12

Stations

40

Avg weeks to build

Cairns Museum School of Arts

CairnsMuseumSchoolofArts

Centres&Libraries

$6.6M

Project value

46

Weeks to build

Cairns Foreshore

CairnsForeshore

Sporting,Parks&Recreation

$11M

Project value

48

Weeks to build

Cairns Cruise Liner Terminal

$8M

Project value

46

Weeks to build

10

Awards won

HowardSmithWharves

Entertainment&Leisure

$130M

Project value

99

Weeks to build

1500m²

Exhibition space

5

Star Hotel

Novotel South Bank

$47M

Project value

90

Weeks to build

238

Rooms

Ironside State School - Junior Learning Centre

$4M

Project value

32

Weeks to build

10

General learning areas

Grange Residences

$14M

Project value

62

Weeks to build

GH Australia

GHAustralia

Office

$220K

Project value

24

Weeks to build

Vue Bondi Junction

$65M

Project value

146

Weeks to build

19

Levels

133

Apartments

Blackwater Aquatic Centre

BlackwaterAquaticCentre

Sporting,Parks&Recreation

$14.7M

Project value

54

Weeks to build

2

Pools

30kW

Solar farm

Alpha Emergency Hub

$13.4M

Project value

34

Weeks to build

34

Modules

SeaLife Underwater World

SeaLifeUnderwaterWorld

Entertainment&Leisure

$750K

Project value

2800m²

Built area

12

Weeks to build

Altrove by Stockland

$20.5M

Project value

60

Weeks to build

54

Townhouses

5

Fonzi flats

Mercedes-Benz

Mercedes-Benz

Showroom

$8.9M

Project value

42

Weeks to build

8095m²

Built area

Fresh & Save Food Warehouse

$3.9M

Project value

25

Weeks to build

2

Awards

3500m²

Built area

Victoria Parade Units

VictoriaParadeUnits

CommunityHousing

$8.2M

Project value

59

Weeks to build

16

Homes

20

Local Indigenous workers

Nova 8 Display

Nova8Display

DisplaySuite

$1M

Project value

11

Weeks to build

7-Eleven Service Stations (15+ Stores)

$74M

Combined value

20

Stores built

33

Avg weeks to build

Vida by Stockland

$26M

Project value

111

Weeks to build

96

Townhomes

Ibis Styles Hotel

$51.8M

Project value

93

Weeks to build

12

Levels

5 STAR

Green Star

Atira Student Accommodation

AtiraStudentAccommodation

StudentAccommodation

$67.7M

Project value

105

Weeks to build

2

Towers

576

Beds

Ascot Residences

$9M

Project value

77

Weeks to build

St Luke's Green

StLuke'sGreen

AgedCare

$35M

Project value

106

Weeks to build

61

Independent and assisted living apartments

60

Boutique care suites

Brisbane 1

Brisbane1

HighRise

$218M

Project value

126

Weeks to build

744

Apartments

3

Towers

Aveo Newstead

AveoNewstead

Retirement

$116M

Project value

80

Weeks to build

144

Independent living units

Newstead Central

NewsteadCentral

HighRise

$189.5M

Total project value

245

Total weeks to build

634

Apartments

3

Towers

313 Adelaide Street

$12M

Project value

50

Weeks to build

12

Storeys

5

Star NABERS rating

Knauf Plasterboard Factory

KnaufPlasterboardFactory

ProcessingPlant

$18M

Project value

41

Weeks to build

27,000m²

Built area

Kennards Self Storage

$33M

Combined project value

6

Projects

Jewel Fine Foods

JewelFineFoods

Food/Beverage

$21M

Project value

40

Weeks to build

12,000m²

Built area

Lume Apartments

$51M

Project value

94

Weeks to build

119

Apartments

6 James Street Facelift

$600K

Project value

21

Weeks to build

$2.9M

Project value

50

Weeks to build

$13M

Combined value

16

Weeks to build total

2

Projects

31

Modules

$170M

Project value

130

Weeks to build

131

Stunning apartments

121

Five star hotel rooms

The Link / End of Trip

$5M

Project value

21

Weeks to built

299 Adelaide Street

$30M

Project value

73

Weeks to built

2

Projects

Halcyon Spa

HalcyonSpa

Hotel

$2.5M

Project value

42

Weeks to build

Myer Distribution Centre

$1M

Project value

8

Weeks to built

11,000m²

Built area

West End Residences

$99M

Project value

85

Weeks to build

231

Homes

The Standard

TheStandard

HighRise

$108M

Project value

125

Weeks to build

268

Apartments

44,747m²

Built area

Avignon

Avignon

LowRise

$11.1M

Project value

85

Weeks to build

15

Townhouses

Dee Why RSL

DeeWhyRSL

Club

$55M

Project value

106

Weeks to build

$10.8M

Project value

69

Weeks to build

7

Apartments

The Star Gold Coast

$275M

Project value

182

Weeks to build

53

Storeys

316

Premium rooms

PARQonFlinders

MixedUse

$90M

Project value

106

Weeks to build

4

Towers

224

Apartments

Illumina

Illumina

HighRise

$67M

Project value

108

Weeks to build

21

Storeys

221

Apartments

QFES & QAS Bundaberg

QFES&QASBundaberg

EmergencyServices

$9.3M

Project value

55

Weeks to build

12

Emergency vehicle bays

$108M

Project value

88

Weeks to build

Early

Delivery

2

Stages

Adina

Adina

Hotel

$45M

Project value

220

Rooms

Ripley Town Centre

RipleyTownCentre

NeighbourhoodCentre

$25.8M

Project value

53

Weeks to build

5 STAR

Green Star

Park Road Boardwalk

ParkRoadBoardwalk

Roadworks&Bridges

$7M

Project value

34

Weeks to build

420M

Boardwalk

SIMS Metal Management

$2M

Project value

32

Weeks to build

Wesley Specialist Centre

$4.8M

Project value

59

Weeks to build

1800M²

GFA

Timber Tots Child Care

TimberTotsChildCare

EarlyEducation

$5M

Project value

57

Weeks to build

ICON Tower A (QLD Gov)

$74M

Project value

91

Weeks to build

5 Star

Green Star

18,000m²

Built area

Deakin University Student Village

DeakinUniversityStudentVillage

StudentAccommodation

$34M

Project value

82

Weeks to build

399

Beds

5 STAR

Green Star

William Stimson Public School

$12.9M

Project value

83

Weeks to build

4096M²

GFA

Merrylands Public School

$9.7M

Project value

59

Weeks to build

2514M²

Homebase GLA

Lidcombe Public School

$12.7M

Project value

83

Weeks to build

3747M²

GFA

The Langston

TheLangston

MixedUse

$211M

Project value

131

Weeks to build

3

Towers

463

Residences

272HedgesAvenue

HighRise

$140M

Project value

178

Weeks to build

44

Storeys

98

Exquisite residences

Tuggerah Super Centre

TuggerahSuperCentre

NeighbourhoodCentre

$7.9M

Project value

31

Weeks to build

South East Dermatology

$1.7M

Project value

17

Weeks to build

6

Operating theatres

Richmond Place

RichmondPlace

MidRise

$18.2M

Project value

76

Weeks to build

59

Apartments

9

Storeys

The Residences - Crimson Hill

$11.3M

Project value

57

Weeks to build

12

Homes

Utopia Space

UtopiaSpace

MidRise

$100M

Project value

124

Weeks to build

300

Apartments

26

Levels

Broken Hill Health Service Redevelopment

$21.6M

Project value

49

Weeks to build

42

Modules

YMCA Integrated Wellness Centre

YMCAIntegratedWellnessCentre

Sporting,Parks&Recreation

$4.1M

Project value

33

Weeks to build

Carl's Jr, Slacks Creek

Carl'sJr,SlacksCreek

Restaurant/Café

$1.4M

Project value

23

Weeks to build

233m²

Built area

The Sebel Yarrawonga

$28.6M

Project value

73

Weeks to build

63

Rooms

Brisbane Arcade

$1.2M

Project value

28

Weeks to build

30+

Year relationship

Hotel Esplanade (The Espy)

$12M

Project value

47

Weeks to build

12

Bars

3

Performance stages

Allity Princeton View - Stage A-G

$10M

Project value

59

Weeks to build

7

Stages

Manunda Place

ManundaPlace

MixedUse

$55M

Project value

80

Weeks to build

9

Levels

1

Public car park

The Fantauzzo

$49M

Project value

70

Weeks to build

5

Star

166

Rooms

North Lakes State College

$15.2M

Project value

64

Weeks to build

Prospect

Prospect

MidRise

$75M

Project value

104

Weeks to build

25

Levels

194

Apartments

Howard Police & Fire Station

HowardPolice&FireStation

EmergencyServices

$6.5M

Project value

59

Weeks to build

Newport Retirement Living

$46M

Value of project

89

Weeks to build

Coolum Beach Christian College

$2.2M

Project value

39

Weeks to build

McIntyre Centre Shed

McIntyreCentreShed

Sporting,Parks&Recreation

$225K

Project value

4

Weeks to build

The Fort

TheFort

Entertainment&Leisure

82

Weeks to build

2

Live music venues

The Sony Foundation's You Can Centre

$1.5M

Project value

23

Weeks to build

West End State School

$38M

Project value

2022

Delivery

2

Stages

4

Levels

Maroondah Hospital Multi-Deck Car Park

$11.9M

Project value

53

Weeks to build

542

Parking Spaces

5

Levels

Encore

Encore

MidRise

80

Weeks to build

84

Luxury apartments

Vue

MidRise

81

Weeks to build

71

Luxury apartments

101 Moray

101Moray

Office

$69M

Project value

69

Weeks to build

16,000m²

NLA

TheLandmark

HighRise

$260M

Project value

133

Weeks to build

417

Luxury apartments

95,427M²

GBA

Logan Hospital Ward 2M

$7.5M

Project value

18

Weeks to design & build

28

Additional beds

Queen Street Village

$115M

Project value

72

Weeks to build

2

Stages

Nicholas Street Precinct

$128M

Project value

84

Weeks to build

5

Stages

9

Office floors

Langlands Park Memorial Pool

LanglandsParkMemorialPool

Sporting,Parks&Recreation

$6.6M

Project value

66

Weeks to build

3

Pools

Eight

Eight

Office

$6.5M

Project value

71

Weeks to build

6

Levels of office

Plumbing Industry Climate Action Centre (PICAC) Beenleigh

$5M

Project value

29

Weeks to build

Plumbing Industry Climate Action Centre (PICAC) Narre Warren

$23M

Project value

73

Weeks to build

QTP Cobalt Warehouse

$6.5M

Project value

46

Weeks to build

Canopy Apartments

$17.9M

Project value

74

Weeks to build

51

Homes

NationalCricketCampus

Sporting,Parks&Recreation

$7M

Project value

37

Weeks to build

3

Ovals

Adelaide Street Townhouses

$15M

Project value

84

Weeks to build

34

Garden townhouses

3

Levels

Aura Industrial Park

$1.2M

Project value

48

Weeks to build

Bli Bli Village Centre

$3.9M

Project value

66

Weeks to build

7

Retail Tenancies

Nambour Special School

$7M

Project value

78

Weeks to build

12

General learning areas

6

Withdrawal rooms

Baringa Retail Centre

BaringaRetailCentre

NeighbourhoodCentre

$23M

Project value

51

Weeks to build

107 Darling Road Townhouses

$7M

Project Value

84

Weeks to build

9

Luxury townhouses

TPCH Cystic Fibrosis Refurbishment

$1.6

Project value

13

Weeks to build

St Bart's Anglican Church

StBart'sAnglicanChurch

Cultural&Religious

$4.1M

Project value

56

Weeks to build

2

Stages

Herston Quarter

HerstonQuarter

MixedUse

$210M

Project value

80+ Years

Hutchies' history in the precinct

5

Hectare precinct

Little Hall

LittleHall

StudentAccommodation

$97M

Project value

112

Weeks to build

669

Beds

Footscray Learning Precinct

Late 2020

Project Delivery

2

Separable Portions

Whitton Lane

WhittonLane

MidRise

$70M

Project value

154

Weeks to build

126

Residences

MOBO

MOBO

Office

$72M

Project value

110

Weeks to build

5 STAR

Target NABERS

14

Storeys

Bela by Mosiac

BelabyMosiac

HighRise

$58M

Project value

102

Weeks to build

119

Apartments

25

Storeys

Woolworths Regional Distribution Centre Expansion

$46M

Project value

77

Weeks to build

3,500

Solar panels

Ampol Headquarters

$46M

Project value

66

Weeks to build

9,911m²

GBA

Odyssey

Odyssey

AgedCare

$32M

Project value

77

Weeks to build

99

ILUs

The Verge at Burleigh

TheVergeatBurleigh

Retirement

$90M

Total project value

193

Total weeks to build

168

Independent Living Apartments

Parkridge Noosa

3

Stages

$77M

Value of project

170

Weeks to build

Youth Foyer

YouthFoyer

CommunityHousing

$18.3M

Project value

74

Weeks to build

73

Apartments

Proserpine Administration Building

$10.6M

Project value

51

Weeks to build

2,292m²

GBA

Wilson Memorial Hospital

$9M

Project value

69

Weeks to build

18

Beds

Melbourne Airport T2 Retail Expansion

$8M

Project value

57

Weeks to build

YMCA Gym

YMCAGym

Sporting,Parks&Recreation

$7.7M

Project value

58

Weeks to build

Shellharbour Airport Terminal

$6.2M

Project value

48

Weeks to build

LifeFlight Hangar & Offices

LifeFlightHangar&Offices

EmergencyServices

$3.9M

Project value

47

Weeks to build

Domic

Domic

House

$17M

Project value

147

Weeks to build

25m

Outdoor pool

James Cook University

$137M+

Combined value

21+

Projects built

1992

Year of first project

Chester&Ella

MidRise

$113M

Project value

104

Weeks to build

319

Apartments

77Jefferson

MidRise

$7.2M

Project value

53

Weeks to build

8

Luxury apartments

Mudgee Hospital

MudgeeHospital

Hospital

$47M

Project value

86

Weeks to build

Northcliffe Residences

$53M

Project value

103

Weeks to build

29

Levels

75

Apartments

ADGE Hotel

ADGEHotel

Hotel

Jan Juc Surf Life Saving Club

JanJucSurfLifeSavingClub

Sporting,Parks&Recreation

$5.5M

Project value

72

Weeks to build

The Waterford @ Hervey Bay

$30M

Project value

72

Weeks to build

145

Beds

Centenary Heights State High School - Performing Art Centre

$8.7M

Project value

39

Weeks to build

$35M

Project value

49

Weeks to build

NAIF

Funded

Cobar Health Service

$20M

Project value

73

Weeks to build

5

Stages

Lion Milk Distribution Centre

$14M

Project value

53

Weeks to build

5,000m²

Built area

MainStream Aquaculture Fish Farm Expansion

$13M

Project value

65

Weeks to build

4.9M

Litres of tanks

8

Tanks

Condabri SP7 Distribution Centre

$15M

Project value

33

Weeks to build

80,000m²

Site area

Southpoint Emporium Hotel & Residences

$200M

Combined value

146

Hotel suites

196

Apartments

2

Towers

Vue Terraces

VueTerraces

LowRise

$92M

Project value

4

Stages

263

Terrace homes

The Ambrose

TheAmbrose

MidRise

$62M

Project value

82

Weeks to build

181

Apartments

Kelso Apartments

$11M

Project value

67

Weeks to build

46

New apartments

Scotch College — Keon-Cohen Dining Hall & Scotch Square

$12M

Project value

50

Weeks to build

Queensland Ambulance Service Station Kenilworth

$1.6M

Project value

45

Weeks to build

Queensland Ambulance Service Station Kingaroy

$2.3M

Project value

40

Weeks to build

Ada Lane

AdaLane

Store

$3.5M

Project value

48

Weeks to build

$23M

Combined value

4

Projects

48

Eco Cabins

17

Safari tents

Noosa Heads Residence

48

Weeks to build

$2.3M

Project value

4

Rooms

McDonald's Westbrook

McDonald'sWestbrook

Restaurant/Café

$745K

Project value

12

Weeks to build

Banjo's Bakery Cafe

Banjo'sBakeryCafe

Restaurant/Café

$1M

Project value

22

Weeks to build

Stretton State College

$6.2M

Project value

38

Weeks to build

Early

Delivery for 2021

Pallara State School

$10.5M

Project value

24

Weeks to design & build

66

Building modules

3

Storeys

Adelaide Clinic Redevelopment

$8.5M

Project value

57

Weeks to build

1500m²

Hospital extension

HealthOne

Clinic

$4M

Project value

39

Weeks to build

Epiq Marketplace

EpiqMarketplace

NeighbourhoodCentre

$19M

Project value

69

Weeks to build

Corinda State High School

$7.4M

Project value

41

Weeks to build

Fabric Apartments

$25.5M

Project value

52

Weeks to build

8

Levels

73

Apartments

31 Duncan Street

$99M

Project value

44

Weeks to build

17

Levels

24,200m²

GBA

Rendu Towers by Ozcare

$165M

Project value

97

Weeks to build

259

Places

Benevolent Living on West

$39.5M

Project value

131

Weeks to build

Queen's Wharf Brisbane Display Suite & Visitor Centre

$4.2M

Project value

21m

Raised

Bundaberg Aeromedical Base

BundabergAeromedicalBase

EmergencyServices

$5.4M

Project value

26

Weeks to build

Julia Reserve Community Centre

JuliaReserveCommunityCentre

Centres&Libraries

$6.3M

Project value

47

Weeks to build

Baroona Road Mixed Use

BaroonaRoadMixedUse

NeighbourhoodCentre

$2.4M

Project value

39

Weeks to build

Metro Arts

MetroArts

Entertainment&Leisure

$3.3M

Project value

23

Weeks to build

Nirimba Sports Clubhouse & Amenities

NirimbaSportsClubhouse&Amenities

Sporting,Parks&Recreation

$500K

Project Value

14

Weeks to build

Ampol, Foodary & KFC

Ampol,Foodary&KFC

ServiceStation

$3.7M

Project value

51

Weeks to build

Lato Baia & Majestic Cinemas

$27M

Project value

80

Weeks to build

66

Apartments

6

Cinemas

Wishlist Centre

WishlistCentre

Centres&Libraries

$8M

Project value

41

Weeks to build

Paradise Centre

ParadiseCentre

Entertainment&Leisure

$17M

Project value

60

Weeks to build

8

New beach front restaurants

ECI

Delivery

$65M

Project value

105

Weeks to build

1100

Students

Miami Aquatic Centre

MiamiAquaticCentre

Sporting,Parks&Recreation

$18M

Project value

84

Weeks to build

10

Lane 50m pool

Snap Fitness @ Keppel Bay Plaza

SnapFitness@KeppelBayPlaza

NeighbourhoodCentre

$2.2M

Project value

20

Weeks to build

600m²

Tilt panel building

Gracemere Auxiliary Fire & Rescue Station

$1.8M

Project value

44

Weeks to build

RDO Equipment Launceston

$6M

Project value

44

Weeks to build

N°1 Anzac Square

$20M

Project value

61

Weeks to build

288 Edward Street

$11M

Project value

30

Weeks to build

Mainsbridge School for Specific Purposes

$22.6M

Project value

92

Weeks to build

360 Queen Street

$302M

Project value

165

Weeks to build

45,000m²

NLA

The Langham Hotel at Jewel

$111M

Project value

66

Weeks to build

169

Suites

11

Event spaces

UTAS Hobart Accommodation

UTASHobartAccommodation

StudentAccommodation

$70M

Project value

99

Weeks to build

422

Beds

12

Accessible beds

Norfolk

MidRise

$25M

Project value

97

Weeks to build

20

Apartments

6,712m²

GBA

Pacific

Pacific

MidRise

$16.5M

Project value

82

Weeks to build

16

Apartments

11

Storeys

Kingsford Terrace

KingsfordTerrace

Retirement

$168M

Total project value

69

Average weeks to build

224

Apartments

7

Stages

Step Up Step Down

$25M

Project value

88

Weeks to build

3

Facilities

Clyde Creek Primary School

$21.5M

Project value

53

Weeks to build

BP Service Stations (6+ Stores)

$9.5M+

Combined value

6+

Stores built

30

Avg weeks to build

Peninsula Private Hospital

$30M+

Combined value

2

Projects

Wellcamp Regional Trade Distribution Centre

$5.7M

Project value

28

Weeks to build

3,000m2

Built area

Parliamentary Annexe Refurbishment

24

Levels

53

Weeks

Mali

Mali

MidRise

$32M

Project value

83

Weeks to build

13,700m²

GBA

55

Residences

WestVillage

MixedUse

$550M+

Project value

12+

Stages

6

Apartment towers

1,000+

Residences

MYAC Eco Tourism

MYACEcoTourism

TouristAttraction

$1.2M

Project value

25

Weeks to build

Midin Clinic Atherton

$5.7M

Project value

40

Weeks to build

Townsville Sports Precinct

TownsvilleSportsPrecinct

Sporting,Parks&Recreation

$12M

Project value

50

Weeks to build

QFESMaryborough

EmergencyServices

$14.5M

Project value

62

Weeks

CLT

Cross Laminated Timber

166 tons

CO₂ saved

NationalThrowsCentreofExcellence

Sporting,Parks&Recreation

$2.4M

Project value

29

Weeks to build

Pacific Pines State High School Junior Learning Precinct

$20M

Project value

43

Weeks to build

8

New GLAs

Gold Coast Airport Airside Processing Zone

$12M

Project value

48

Weeks to build

22,415M²

Built area

$50M

Project value

82

Weeks to build

Exhibition Quarter

$199M

Project value

133

Weeks to build

443

Built-to-Rent Apartments

37

Levels

Royale

Royale

HighRise

$176M

Project value

192

Weeks to build

104

Residences

38

Levels

$75M

Project Value

104

Weeks to build

4

Star

235

Rooms

Wallenius Wilhelmsen

$19M

Project value

47

Weeks to build

JCUStudentAccommodation

StudentAccommodation

$46.4M

Project value

67

Weeks to build

400

Beds

10,000m²

Built area

Green Energy Manufacturing Centre (GEM)

$56.5M

Project value

59

Weeks to build

12,990m²

Built area

2GW

Capacity per annum

RDO Equipment Adelaide

$6.5M

Project value

27

Weeks to build

Habitat Early Learning Peregian Springs

$8M

Project value

48

Weeks to build

Habitat Early Learning Nundah

$9.8M

Project value

63

Weeks to build

3

Levels

Cabarita Apartments

$10.5M

Project value

88

Weeks to build

Mabel Park State High School

$12.5M

Project value

45

Weeks to build

Somerset Rise

SomersetRise

LowRise

$15M

Project value

57

Weeks to build

15 Chapel Street

15ChapelStreet

Lutwyche,QLD

$13.5M

Project value

67

Weeks to build

38

Apartments

Burleigh Leagues Club

$5.8M

Project value

55

Weeks to build

Glen Innes Ambulance Station

GlenInnesAmbulanceStation

EmergencyServices

$6.3M

Project value

41

Weeks to build

Bundaberg Brewed Drinks

BundabergBrewedDrinks

Food/Beverage

$69.5M

Project value

93

Weeks to build

22,600m²

GBA

80

Ton brew tanks

Blacktown Mental Health Recovery Centre

$36M

Project value

80

Weeks to build

44

Beds

Bunnings Trade Centre at Metroplex

$23M

Combined project value

87

Weeks to build

Murcia Residences

MurciaResidences

Residential

$220M

Project value

180

Weeks to build

210

Residences

Plaîs Early Learning

$11.3M

Project value

34

Weeks to build

205NorthQuay

Office

$373M

Project value

178

Weeks to build

6 Star

Green Star

43,700m²

NLA

Ipswich AODRRF

IpswichAODRRF

Community

$20M

Project value

66

Weeks to build

36

Residents

10

Withdrawal unit beds

Brisbane Airport Expansion

$8.3M

Project value

38

Weeks to build

XXXXM²

Built area

halō

halō

Residential

$238M

Project value

159

Approx. weeks to build

286

Apartments

34

Levels

Normanton Hospital

$36M

Project value

53

Weeks to build

18

Beds

Mondrian Hotel + Residences

$200M

Project value

195

Weeks to build

84

Private residences

208

Guest rooms

Preview of the newly delivered new Junior School at Brisbane Girls Grammar School

$27.8M

Project value

72

Weeks to build

Volleyball Academy Complex at Craigslea SHS

$16.2M

Project value

45

Weeks to build

Browne Park Stadium Western Grandstand

$55.2M

Project value

84

Weeks to build

3,253

Seats

3

Levels